RSS订阅 加入收藏  设为首页
十大时时彩正规平台

十大时时彩正规平台:Construction of Second Humen Bridge progresses

时间:2018/5/30 5:38:58  作者:  来源:  浏览:0  评论:0
内容摘要:Construction of the Second Humen Bridge project saw major breakthrough on May 25th as the last girder was put in place above the Nizhou Cana...

Construction of the Second Humen Bridge project saw major breakthrough on May 25th as the last girder was put in place above the Nizhou Canal, marking the completion of its two main sections. The bridge is planned to open to traffic in the first half of 2019.

Known as the world’s widest steel-box-girder suspension bridge, the Second Humen Bridge is with 8 lanes and a designed traffic capacity of 100 thousand vehicles per day. Once completed, it will ease pressure on the existing Humen Bridge and shortening the commute between Guangzhou and Dongguan by half an hour.

The bridge is one of the major infrastructure projects in the development of the Guangdong-Hong Kong-Macao Bay Area, aiming to improve the flow of traffic between both sides of the Pearl River Estuary.

?

Reported by Jasmine Yin

Edited by Olivia Ouyang

十大时时彩正规平台:Construction_of_Second_Humen_Bridge_progresses

Construction of the Second Humen Bridge project saw major breakthrough on May 25th as the last girder was put in place above the Nizhou Canal, marking the completion of its two main sections.[Photo provided to Newsgd.com]


相关评论

本类更新

本类推荐

本类排行

本站所有站内信息仅供娱乐参考,不作任何商业用途,不以营利为目的,专注分享快乐,欢迎收藏本站!
所有信息均来自:百度一下 (十大时时彩正规平台)
蜀ICP备12625456280号